The first order of business is to remove the old mailbox.
Install mailbox to concrete wall.
Https bit ly 2v1qbt2 please follow our blog.
Use a mounting bracket and screws to attach your mailbox to the top of the post.
Attach any hardware necessary to your mailbox or the wall as instructed on your mailbox s installation manual.
Post office specifications state the mailbox should be between 41 to 45 inches from the road surface to the bottom of the mailbox or mailbox entry point.
Mark the location of the mounting holes with caulk.
How to install and fix a post box mailbox subscribe.
Use the measuring tape to mark a spot the appropriate distance away from the road to install the mailbox post.
The mailbox also needs to be 6 to 8 inches back from the curb.
Position your mailbox 41 to 45 inches from the road surface to the bottom of the mailbox or point of mail entry.
Video of the day.
Each hole is large enough to fit a screw through.
Place your mailbox 6 to 8 inches back from the curb.
Have a helper hold a level over the top of the mailbox.
Put your house or apartment number on the mailbox.
Fill the hole with dirt and attach your mailbox.
They also have a little loop cut out that will fit snugly around the threads of a screw.
Make marks on the wall with a pencil through the screw holes at the rear of the mailbox or the bracket attached to the mailbox.
Hold the mailbox on the wall in the desired mounting position.
Determine the location on the wall where you want to mount the mailbox by holding it in place.
If you do not have a raised curb contact your local postmaster for guidance.
If you do not have a raised curb contact your local postmaster for guidance.
Dig a post hole.
Position your mailbox 41 to 45 from the road surface to the bottom of the mailbox or point of mail entry.
Here are some helpful guidelines to follow when placing your mailbox.
Usps guidelines state that post mount mailboxes should be installed at a height of 41 45 inches from the road surface to the bottom of the mailbox and face 6 8 inches away from the road.
I decided to back fill the 33 inch deep hole up to about 19 inches deep.
Once the concrete has been given plenty of time to set cover the concrete up with dirt and flatten it so that it sits evenly with the rest of the ground.