Install the roofing nails 1 from the upper edge of the rolled roofing.
How to nail roll roofing.
Cover the valley of the roof.
This will allow the next course to cover the nail heads by 1 and make sure they are installed securely into the roofing.
Nail down the 18 inch roll roofing sheet that it is covering the valley.
How to do it.
Install peel and stick roofing in a similar manner.
The first bed of roll roofing should be at least 36 inches thick.
Apply about two inches worth of cement under either side to seal the roofing down and then nail it down making sure it still stays flat and even as you go.
Install each course of roofing like the concealed nail method.
Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
Cover the preceding layer with 36 inch roll roofing.
It was pretty easy to install and took about an hour to do by myself including setup and tear.
Bought this roll from home depot.
The valley of the roof is the point on the roof where the two sides meet.
Things you ll need rolled roofing razor knife trowel brush hose measuring tape ladder roofing cement 1 inch 2 5 cm long roofing nails hammer chalk.
The nails should start.
How to apply roll roofing installation using the concealed nail method.
Hammer down the nails at the edges of the sheets covering the valley.
Make sure that the roof is completely clean.
Install drip edge flashings roofing felt and wsu if needed.
How to nail down roll roofing step 1.
Roll out the first sheet and ensure that it lies flat and even.
For hips and.
Using the exposed nail method.
It not only protects the roof but it also protects the fascia.
The key to a tight roof is applying the roofing when it is warm enough for.
This is not a how to video.
As you work your way up.
You can install metal valley flashing but it is common to.